top of page

Residential

Woodinville House

New Construction

GC: NW Builder Group

Mt. Si Remodel

The main goal on this project was to increase the views of Mt. Si from the back of their home.  The only way previously was to walk up close to the window.  Before/After shots at the end of the gallery

Terrene Homes

These are several homes that Neil designed while working at Terrene Homes (Terrenehomes.com)

Redmond Addition

The main objective for this remodel was to add  (2) bedrooms above the garage, extend garage forward, update the entry and change the style to Northwest Craftsman.

Kirkland Addition

Scope of work:

Add master bedroom suite over existing detached garage and ADU, update and rearrange main living space, and upate exterior to a more modern look.

Kirkland Kitchen Remodel

Scope of Work:

Open up floor plan to enlarge kitchen and have

an island for entertaining.

 

Contractor:

AGB Construction

Aaron Bellamy

Scope of Work: 

The client wanted an open concept plan, new master suite, and convert the family room back to a garage

 

Contractor:

Thornberg Construction

Bellevue Kitchen Remodel

Kitchen addition/remodel in Bellevue

 

Contractor: 

Sound Renovation Inc.

Todd Sanders

 

 

 

 

 

 

 

 

 

Kirkland Remodel

Kirkland Second Story Addition

Scope of Work:

rework main floor layout, add garage

second story addition 

Contractor:

Thornberg Construction

Ames Lake New Construction 

Scope of Work:

construct new 4,245 S.F. single family residence

 

Contractor:

NW Builder Group LLC

Bothell Addition/Remodel 

Scope of Work:

construct new 210 s.f.
single story addition & 184 S.F. covered patio

 

Contractor:

Rainier Custom Homes

bottom of page